Hello all,
My company is an NX house, but has taken on a contract to reproduce a data package in Pro/E Wildfire 4.0.
We have struggled, but have produced sample drawings that are passing all Modelcheck tests. We are now faced with some detail questions regarding how we represent datum targets on...
We have CAST installed on a network drive. We specified the install location for both the CAST html files and the part files as separate folders.
We do not access CAST from within NX and we do not access our example part files from within CAST. We have a session of NX running alongside CAST...
Our models and drawings are stored in a single program folder. Our standard parts are in a separate folder.
Our destination folders will be handled by the PLM system.
My company's current file naming convention is:
master model: mm123-123456.rev-0.prt
drawing: 123-123456.rev-.prt
The dash after the rev is our major revision for the drawing and model. The 0 after the master model major rev is to allow incremental revisions to the model that do not...
WE used E/Pak version 5.7.6 with NX5.
Contact this fellow or check out the website for help with the upgrade/installation/bug squashing:
Keith Anderson
403-247-8994
www.ltxsi.com
John,
Not that I'm aware of....other than our company drafting room manual that has a few such questionable entries. :o)
I cannot argue the lack of industry standard, I can only ask how to make it work. (-:
We currently use the hex id symbol, but paste it over a few extra spaces in the text...
Hello All,
I've tried searching for the following topics, but haven't found anything, so if I repeat a previously posted question, please forgive and point me in the right direction.
My questions are:
Now that we can add/remove an all around symbol from annotation leaders, can we add/remove...