How much specification wise do you folks show on the drawings? Do you have a min requirement for back filling behind walls, around footings, under slabs, etc?
Min compaction requirements? Moisture content? lift heights?
Or is it better to leave that to the geotech report i.e. "All soil back filling requirements per recommendations of geotechnical engineer."
What is no report is done?
Thanks