pootong
Mechanical
- Feb 11, 2003
- 20
Steel structure for boiler column is bent after erection, it can be seen by our eyes. After measurement, it is clear that the column is offset at mid span between bracing points about 15 mm. Distance from one bracing piont to the other is 6,000 mm. It is stated in AISC that allowable off set is 1/1000 that means only 6 mm. Could you give recommendation on this issue how we fix this problem.