All,
What policy do you have when a contractor calls and requests the cad files as a "background" for their shop drawings. We have a disclaimer letter we require to be signed, but we have heard of others charging for these files (which makes sense).
akastud
What policy do you have when a contractor calls and requests the cad files as a "background" for their shop drawings. We have a disclaimer letter we require to be signed, but we have heard of others charging for these files (which makes sense).