Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Overdriven Nails/Fasteners into roof sheathing 1

Status
Not open for further replies.
Replies continue below

Recommended for you

danielharr79

wale01 is steering you in the right direction. Based on a seminar I attendent recently the APA recommendations are:

If less than 20% of the fastners are overdirven by 1/8" or less then they can be ignored. If over 20% of the fasteners are overdriven by more than 1/8" then add one nail for every two that are overdriven.

APA can provide you with more information. One concern is possible splitting of the lumber that the plywood is attached to.

I glanced at the thread SlideRuleEra refered you to, so hopefully I am not repeating information in that thread. You definitely would want to read that thread because it contains a lot of useful information.

 
Status
Not open for further replies.
Back
Top