yungenr1
Structural
- Dec 10, 2008
- 4
During shop drawing review, we looked at a few of our composite beam cant. designs again because of the connections used by the detailer.
During this review, we've found that the our program (RAM Steel) designs cant. beams as pinned at the column, so the only moment was that from the cant. When I fix this connection, as it actually is, the moment is greater and then my moment value provided to the detailer is no longer valid (it is lower) and the beam design is over stressed by about 5-10%.
This is for a single beam (occurs) 5 times (changing from one size (8" flange) to a 10" flange (2 weight sizes) fixes the problem. I'm not sure how to tell my boss (it is his stamp, but I did the design.)
Some of our columns don't work either in random locations due to the program not putting moment from the moment connection into the column.
What should I do? Right now I feel like just quitting and staying away from structural engineering forever.....Sigh.
During this review, we've found that the our program (RAM Steel) designs cant. beams as pinned at the column, so the only moment was that from the cant. When I fix this connection, as it actually is, the moment is greater and then my moment value provided to the detailer is no longer valid (it is lower) and the beam design is over stressed by about 5-10%.
This is for a single beam (occurs) 5 times (changing from one size (8" flange) to a 10" flange (2 weight sizes) fixes the problem. I'm not sure how to tell my boss (it is his stamp, but I did the design.)
Some of our columns don't work either in random locations due to the program not putting moment from the moment connection into the column.
What should I do? Right now I feel like just quitting and staying away from structural engineering forever.....Sigh.