Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

SEP REQT with all datum references at RMB/nonsize

Status
Not open for further replies.

Burunduk

Mechanical
May 2, 2019
2,339
In this video the speaker says at about 5 minutes mark that simultaneous requirements can only be overridden by a notation such as SEP REQT when at least one of the referenced datum features is not at RMB.

I believe this interpretation is not derived from the Simultaneous Requirement definition in the Y14.5 section about datum reference frames, but from the unfortunate way this concept is discussed at the section about tolerances of position. Specifically, it's paragraph 10.5.4 and its subparagraphs that make it look like SEP REQT is only applicable with datum references at MMB/LMB.

Opinions?
 
Replies continue below

Recommended for you

Status
Not open for further replies.

Part and Inventory Search

Sponsor