I am working on a redesign of the mechanical components of a 40 story building with about 150,000 SF of residential condo and 75,000SF commerical (food service)
What are the 3 biggest pitfalls that I could run into, compared to standard HVAC and DHW issues on conventional large (but not tall) buildings.