Lot2Learn
Structural
- May 8, 2011
- 30
A little confused about the three load tables they have for this non-composite deck.
1) Max construction load: I understand that, this is supposed to be with wet concrete.
2) Reinforced concrete allowable loads: I understand this one too, this is the capacity after concrete has cured.
3) Allowable uniform load: This is supposed to be the capacity the metal deck alone will carry. I don’t understand this table, why do I need it, I already have the above two for during construction and after construction capacities, why do I need to check this one?
Looking forward to some guidance from all the experienced folks here. Thanks,
1) Max construction load: I understand that, this is supposed to be with wet concrete.
2) Reinforced concrete allowable loads: I understand this one too, this is the capacity after concrete has cured.
3) Allowable uniform load: This is supposed to be the capacity the metal deck alone will carry. I don’t understand this table, why do I need it, I already have the above two for during construction and after construction capacities, why do I need to check this one?
Looking forward to some guidance from all the experienced folks here. Thanks,