shin25
Structural
- Jul 4, 2007
- 430
I have been working on getting a building permit for a 7200 square feet warehouse. The local building official has mentioned that as a part of obtaining a building permit, the drawings need to be stamped by a P.E. and special inspections must be performed. As far as I am concerned, the warehouse is a storage facility and will not require any of these if the floor area is below 15000 sq.feet. Can anyone shed some light on this?