Stephen Robertson
Mechanical
- Nov 23, 2020
- 1
Is this use of compound datums correct (see uploaded image)? The holes are features drilled into a drafted surface, but for easier machining set up the holes need not be perpendicular to the drafted surfaces (a very slight ellipse will be fine for the cable gland). This leaves no surface to use as a projection datum. My thinking is, for example in the case of the 22 mm hole, that the projection must be established with a combination of A-C, then position established from A then C.