romulus102
Mechanical
- Nov 10, 2016
- 3
I have a part which has to be machined in a fixture. The repair document requires measurement of a runout w.r.t two datums. When the part is placed and held down in the fixture, both the datums locations are hidden by the fixture. In such a scenario, do i just put a DTI on the surface which requires runout to get a measurement, or do i need to clock the datums locations and make sure they are lowest as possible before i proceed to measure the runout. Please refer to the attached image for problem illustration. Any guidance on this matter will be much appreciated.